Case StudyManufacturing

Part Design Solution

By September 9, 2019 September 11th, 2019 No Comments

Business Goal

  • Reputed client offers industry leading concrete pumps for distribution in North and Latin America that previously was a member of a larger group involved in design, manufacture and distribution of premium concrete production and handling equipment.
  • The client desired to design a bicycle ride protection for its identified concrete mixer models. The protection is provided by a guard rail bracket which gets fitted to the chassis.

Challenges

  • The design output was to be delivered within two weeks inclusive of review by the client.
  • Related safety codes needed to be studied for identification of loads & design verification.

Professional Services

Katalyst provided client in line with their design standards :

  • Concepts & 3D Models.
  • 2D drawings.

Inclusion of standard details desired to be included by the client.

Katalyst’s Solution

  • A single deign resource was assigned with support for hand calculations to verify the design.
  • Client was assisted to finalize the unknown dimensional requirements, and helped to decide out of two configuration options evolved on the basis of benchmark studies.

Bolted Structure

Leave a Reply

Reach us
close slider

     

    Please prove you are human by selecting the heart.